Two Floor Prefabricated Labor Mining Camp Container House Modular House

Short Description:

Two Floor Prefabricated Labor Mining Camp Container House Modular House


  • Brand: GS housing / OEM
  • Certifications: CE, EAC, ISO, SGS
  • Lead time: 7 days for bulk order
  • Color: Optional
  • Orgin: Tianjin, Jiangsu, Guangzhou, Sichuan of China
  • porta cbin (3)
    porta cbin (1)
    porta cbin (2)
    porta cbin (3)
    porta cbin (4)

    Product Detail

    Product Tags

    Two Floor Prefabricated Labor Mining Camp Container House Modular House Video

    The mining camp consists of 1605 sets flat packed container houses, prefab houses, detachable houses, include 1095 sets 6055*2990*2896 mm ( 3 meter width ) standard multi functional flat packed container houses, 3 sets 3 meter (width) guard modular houses, 428 sets 2.4 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, and 3 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, 38 sets stair kind flat packed container houses and 41 sets walkway container houses.

    The mining camp were shipped into two batch, the first batch (524 sets) flat packed container houses. After Indionesia cusomter received the first batch container houses and checked the houses quality, they continued to book the second batch from us: 1081 sets flat packed container house, and these modular houses had been deliveried to our customer on time.

    Two Floor Prefabricated Labor Mining Camp Container House Modular House2

    The two floor prefabricated labor mining camp container house modular house were on installation by local worker.

    Mining camp accommodation (6)

    Installation Video of GS Housing Prefabricated Camp

    For the oversea projects, in order to help the contractor save the cost and install the houses ASAP, the installation instructors will go abroad to guide the installation on site, or guide via online-video. in addition, the multi-types installation guides will be sent you to solve various problems.

    The flat packed container house consists of upper frame components, bottom frame components, column and several interchangeable wall plates,and there’re 24 sets 8.8 class M12 high-strength bolts connect the upper frame & columns, column&bottom frame to form an integral frame structure, ensures the stability of the structure.

    Two Floor Prefabricated Labor Mining Camp Container House Modular House

    The product can be used alone, or form a spacious space through different combinations of horizontal and vertical directions. The house structure adopts the cold-formed galvanized steel, the enclosure and thermal insulation materials are all non combustible materials, and the water, heating, electrical, decoration and supporting functions are all prefabricated in the factory. No secondary construction is required, and it can be checked in after on-site assembly.

    Two Floor Prefabricated Labor Mining Camp Container House Modular House

    GS Housing Prefab House Production Bases

    GS Housing's five production bases have a comprehensive annual production capacity of more than 170,000 houses,the strong comprehensive production and operation capabilities provide a solid backing for houses production.

    成都工厂

    Sichuan prefab house production base

    工厂效果图

    Guangdong prefab house production base

    天津工厂

    Tianjin prefab house production base

    常熟工厂

    Jiangsu prefab house production base

    沈阳工厂

    Shenyang prefab house production base


  • Previous:
  • Next: