Container house + prefab KZ house – Metro line 14 in Shenzhen, almost uses 1804 sets container houses

Project Name: headquarters of Shenzhen metro line 14
Project location: Shenzhen
Project contractor: GS Housing
Project scale: 96 sets flat packed container houses, 189 ㎡prefab KZ house
Construction time: 2018
Construction period: 9 days
Project features:
1. The project camp adopts standardized assembly buildings.
2. Fast mobilization and short construction period.
3. Atmospheric "U" shape design

Project Name: No. 1 area project of Shenzhen metro line 14

Project location: Futian District, Shenzhen

Project contractor: GS Housing

Project scale: 162 set flat packed container houses

Construction time: 2018

Construction period: 16 days (including glass curtain wall)

Project design features:

1. The safe and eco-friendly flat packed container house stands on the street.

2. Elegant "U" shaped appearance design overall garden-style project department

3. garden style and courtyard style livable project department.

Project Name: No.2 Area Project of Shenzhen Metro Line 14

Project Location: Shenzhen

Project construction: GS Housing

Project size: 199 sets flat packed container houses

Construction date: 2018

Construction period: 20 days

Project design features:

1. No.2 Area of Line 14 is located in the square of Shenzhen East Railway Station,

2. Adopts broken bridge aluminum glass corridor.

3. Strict access control system.

4. Yellow and blue flat packed container houses, solemn party history display board.

modular homes for sale (2)
modular homes for sale (3)

Project Name: No.3 Area Project of Shenzhen Metro Line 14

Project location: Shenzhen

Project construction: GS housing

Project scale: 232 set container house, 198㎡prefab KZ house

Construction date: 2018

Construction period: 24 days

Project Features:

1. The project camp adopts standardized prefabricated buildings.

2. The project pays attention to the overall garden-style design, with rockery and green plants around.

3. broken bridge aluminum glass doors and Windows.

Project Name: Division 2,No. 3 area of Shenzhen Metro Line 14

Project location: Shenzhen

Project construction: GS housing

Project scale: 132 sets flat packed container houses

Construction date: 2018

Construction period: 12 days

Project Name: No. 4 Area project of Shenzhen Metro Line 14

Location: Shenzhen

Project construction: GS housing

Project scale: 129 set container houses

Construction date: 2018

Construction period: 12 days

Project Name: Section 1, No. 5 area project of Shenzhen Metro Line 14

Project location: Shenzhen city

Project construction: GS housing

Project scale: 170 set flat packed container houses

Construction date: 2018

Construction period: 14 days

Project design features:

1, comfortable camp environment, rockery surrounded

2. "U" shape design.

3. walkway board design in the accommation area

Project Name: Section 2, No.5 area project of Shenzhen Metro Line 14

Location: BYD Park, Baohe Road, Longgang District, Shenzhen

Project construction: GS housing

Project scale: 173 sets falt packed container houses

Construction date: 2018

Construction period: 23 days (including prefab kz house)

Project design features:

1, "one" type packaging box design.

2, park style camp environment, southern scenery, beautiful environment.

3, guangsha housing to create quick room conference room.

4, broken bridge aluminum glass corridor.

5, packaging box room and green plants set off.

Project Name: No.6 area project of Shenzhen Metro Line 14

Location: Shenzhen

Project construction: GS housing

Project size: 199 sets flat packed container houses

Construction date: 2018

Construction period: 20 days

Project design features:

1. The project camp adopts standardized prefabricated buildings.

2. simple "-" font design.

3. broken bridge aluminum glass doors and Windows.

4. External double running stairs.

Project Name: No.7 area project of Shenzhen Metro Line 14

Project location: Shenzhen city

Project construction: GS housing

Project scale: 110 set flat packed container house

Construction date: 2018

Construction period: 10 days

Project design features:

1. The project camp adopts standardized prefabricated buildings.

2. Exquisite "-" shaped appearance design.

3. Lingnan architectural style and modern packaging box room integration, to create a garden-style project department.

Project Name: Depot Project Department of Shenzhen Metro Line 14

Project location: Shenzhen

Project construction: GS housing

Project scale: 202 set flat packed container house

Construction date: 2018

Construction period: 23 days

Interior decoration introduction

According to different needs, GS housing flat packed container house can be designed into office, accommodation, toilet, kitchen, dining room, entertainment room, conference room and other functional units.

modular homes for sale (3)

Meeting room

modular homes for sale (2)

Office

modular homes for sale (4)

Dining room

modular homes for sale (5)

Reception room

modular homes for sale (6)

Staff canteen

modular homes for sale (7)

Kitchen

modular homes for sale (9)

Water closet

modular homes for sale (10)

Recreation room

modular homes for sale (11)

VR Recreation room

modular homes for sale (12)

Dormitory

modular homes for sale (13)

Shower room

modular homes for sale (8)

Toilet

Prefab KZ house introduction

In response to the national green assembly building design concept, GS Housing Quick assembly room (KZ type) achieveed intelligent factory, assembly line production. Control quality strictly, high production efficiency, achieved effective control of large-scale production and cost.

Advantages of Prefab KZ house

1. Large span, high net height, connect with bolts;

2. The site construction is fast, project dept.is fashion and beautiful;

3. Suitable for large conference rooms, dining halls, activity centers, etc.

modular homes for sale (17)
modular homes for sale (18)

Post time: 19-01-22