Project Name: headquarters of Shenzhen metro line 14
Project location: Shenzhen
Project contractor: GS Housing
Project scale: 96 sets flat packed container houses, 189 ㎡prefab KZ house
Construction time: 2018
Construction period: 9 days
Project features:
1. The project camp adopts standardized assembly buildings.
2. Fast mobilization and short construction period.
3. Atmospheric "U" shape design
Project Name: No. 1 area project of Shenzhen metro line 14
Project location: Futian District, Shenzhen
Project contractor: GS Housing
Project scale: 162 set flat packed container houses
Construction time: 2018
Construction period: 16 days (including glass curtain wall)
Project design features:
1. The safe and eco-friendly flat packed container house stands on the street.
2. Elegant "U" shaped appearance design overall garden-style project department
3. garden style and courtyard style livable project department.
Project Name: No.2 Area Project of Shenzhen Metro Line 14
Project Location: Shenzhen
Project construction: GS Housing
Project size: 199 sets flat packed container houses
Construction date: 2018
Construction period: 20 days
Project design features:
1. No.2 Area of Line 14 is located in the square of Shenzhen East Railway Station,
2. Adopts broken bridge aluminum glass corridor.
3. Strict access control system.
4. Yellow and blue flat packed container houses, solemn party history display board.
Project Name: No.3 Area Project of Shenzhen Metro Line 14
Project location: Shenzhen
Project construction: GS housing
Project scale: 232 set container house, 198㎡prefab KZ house
Construction date: 2018
Construction period: 24 days
Project Features:
1. The project camp adopts standardized prefabricated buildings.
2. The project pays attention to the overall garden-style design, with rockery and green plants around.
3. broken bridge aluminum glass doors and Windows.
Project Name: Division 2,No. 3 area of Shenzhen Metro Line 14
Project location: Shenzhen
Project construction: GS housing
Project scale: 132 sets flat packed container houses
Construction date: 2018
Construction period: 12 days
Project Name: No. 4 Area project of Shenzhen Metro Line 14
Location: Shenzhen
Project construction: GS housing
Project scale: 129 set container houses
Construction date: 2018
Construction period: 12 days
Project Name: Section 1, No. 5 area project of Shenzhen Metro Line 14
Project location: Shenzhen city
Project construction: GS housing
Project scale: 170 set flat packed container houses
Construction date: 2018
Construction period: 14 days
Project design features:
1, comfortable camp environment, rockery surrounded
2. "U" shape design.
3. walkway board design in the accommation area
Project Name: Section 2, No.5 area project of Shenzhen Metro Line 14
Location: BYD Park, Baohe Road, Longgang District, Shenzhen
Project construction: GS housing
Project scale: 173 sets falt packed container houses
Construction date: 2018
Construction period: 23 days (including prefab kz house)
Project design features:
1, "one" type packaging box design.
2, park style camp environment, southern scenery, beautiful environment.
3, guangsha housing to create quick room conference room.
4, broken bridge aluminum glass corridor.
5, packaging box room and green plants set off.
Project Name: No.6 area project of Shenzhen Metro Line 14
Location: Shenzhen
Project construction: GS housing
Project size: 199 sets flat packed container houses
Construction date: 2018
Construction period: 20 days
Project design features:
1. The project camp adopts standardized prefabricated buildings.
2. simple "-" font design.
3. broken bridge aluminum glass doors and Windows.
4. External double running stairs.
Project Name: No.7 area project of Shenzhen Metro Line 14
Project location: Shenzhen city
Project construction: GS housing
Project scale: 110 set flat packed container house
Construction date: 2018
Construction period: 10 days
Project design features:
1. The project camp adopts standardized prefabricated buildings.
2. Exquisite "-" shaped appearance design.
3. Lingnan architectural style and modern packaging box room integration, to create a garden-style project department.
Project Name: Depot Project Department of Shenzhen Metro Line 14
Project location: Shenzhen
Project construction: GS housing
Project scale: 202 set flat packed container house
Construction date: 2018
Construction period: 23 days
Interior decoration introduction
According to different needs, GS housing flat packed container house can be designed into office, accommodation, toilet, kitchen, dining room, entertainment room, conference room and other functional units.
Meeting room
Office
Dining room
Reception room
Staff canteen
Kitchen
Water closet
Recreation room
VR Recreation room
Dormitory
Shower room
Toilet
Prefab KZ house introduction
In response to the national green assembly building design concept, GS Housing Quick assembly room (KZ type) achieveed intelligent factory, assembly line production. Control quality strictly, high production efficiency, achieved effective control of large-scale production and cost.
Advantages of Prefab KZ house
1. Large span, high net height, connect with bolts;
2. The site construction is fast, project dept.is fashion and beautiful;
3. Suitable for large conference rooms, dining halls, activity centers, etc.
Post time: 19-01-22