Container house – Phase I of K1 Express Road

Project scale: 51 sets
Construction date: 2019
Project features: The project uses 16 sets 3M standard house, 14 sets 3M raised container house, 17 sets aisle houses+raised aisle house, 2 set toilet house for men and women,1 set raised hallway house, 1 set gate house, the appearance adopts U-shaped design.

High prefabricated and short manufacturing period of flat packed container house. After production in the factory can be packed and transported, also can be FCL transport. Easy to install on site, no need to disassemble for secondary relocation, can move together with house and goods, no loss, inventory.

The frame of flat packed container house adopts galvanized cold-rolled steel profile, stable structure, service life of more than 20 years. Multiple turnover, according to the needs of different regions, fields and uses, to build permanent or semi-permanent buildings, cost-effective. At the same time, it has good ductility and can be used as office, accommodation, restaurant, bathroom, entertainment and combination of large space.


Post time: 04-01-22