Container house – Intercity Railway Project made by prefab modular house

Project Name: Intercity Railway
Project Location: XiongAn New Area
Project Contractor: GS Housing
Project scale:103 sets falt packed container houses, detachable house, modular house, prefab homes

Features:

1.The container dormitory, onsite office and operation area are set separately, with obvious division.
2. The container dormitory area is equipped with a place for drying clothes to avoid hanging and drying clothes at will.
3. The temporary camp is equipped with a separate canteen to solve the problem of workers' meals and ensure the safety of staff during the COVID-19 outbreak.
4. The onsite office is separated from the aisle to ensure the working quality of the staff.
Make full use of the modern achievements of scientific and technological progress, adopt modern technologies and equipment such as new building materials and intelligent control systems, and present the characteristics of "environmental protection, greenness, safety and efficiency" of prefabricated buildings one by one.


Post time: 07-05-22