Since the beginning of this year, the epidemic situation has been delayed and repeated, and the international environment is complex and severe. "The epidemic should be prevented, the economy should be stable, and development should be safe" is the explicit requirement of the CPC Central Committee.
For this purpose, GS Housing bravely assumes its social responsibilities, performs its corporate functions, constantly strengthens the construction of centralized isolation mobile hospital, accelerates the construction progress of makeshift hospitals, builds a protective wall for the majority of medical staff, and escorts the improvement of local service and treatment capacity.
Project overview
Project Name: Tianjin isolation mobile hospital project
Location: Ninghe District, Tianjin
Houses QTY: 1333 porta cabins
Production factory: Tianjin Baodi production base of GS Housing
Project area: 57,040 ㎡
Difficulties when construct the mobile hospital
01 The electrical design of various specifications increases the workload of binding the wall boards;
02 Custom Windows and doors cause difficulty in arranging the panels.
03 Due to the trees on site, the general drawing was adjusted several times.
04 There are decorative prefab cabins with special requirements at the end of each building. We have communicated with Party A for many times to ensure timely delivery.
Supply of porta cabins
The houses and raw materials required for the isolation mobile hospital are supplied directly by the North of China production base of GS housing -- Tianjin Baodi prefab house production base.
At present, GS housing has five prefab house production bases: Tianjin Baodi, Changzhou Jiangsu, Foshan Guangdong, Ziyang Sichuan and Shenyang Liaoning, which have great influence and appeal in the temporary construction industry.
Before entering the project
Before the entrance of the project, GS Housing coordinates and deploys all forces to come up with a feasible planning and design scheme as soon as possible in strict accordance with the requirements of the construction specifications of the makeshift mobile hospital, accelerate the speed and grasp the progress, and build the makeshift mobile hospital on the premise of ensuring the construction safety and quality.
Project discussion
The project team understood the construction conditions of the project in detail, and had in-depth communication with the construction leader on the structure layout and construction process, so as to consolidate the responsibility and keep a close eye on the construction progress of the isolation mobile hospital.
Professional installation of the mobile health container
Xiamen GS housing Construction Labor Co., Ltd. is responsible for the construction of this project. It is a professional installation engineering company affiliated to GS Housing Group, mainly engaged in the installation, demolition, repair and maintenance of flat packed container house and prefabricated KZ house.
All team members have passed professional training, in the construction process, they strictly abide by the relevant regulations of the company, always adhere to the "safe construction, green construction" concept, give full play to the strength of the project construction, vigorous in the strategic task issued, is an important development of GS housing line.
Push forward steadily
The project is still under construction and has not stopped during the National Day holiday. Workers stick to their posts, seize the golden period of construction, race against time to promote the construction of the project.
Post time: 25-10-22