Welcome to visit GS Housing Group at booth N1-D020 of Metal World Expo

From December 18th to 20th, 2024, the Metal World Expo (Shanghai International Mining Exhibition) was grandly opened at the Shanghai New International Exhibition Center. GS Housing Group appeared at this expo (booth number: N1-D020). GS Housing Group displayed the modular construction projects and new construction solutions in recent years, attracting many visitors to consult and negotiate in this booth.

gshousing (4)
gshousing (2)
gshousing (5)
gshousing (3)

As a traditional house for temporary construction industry worldwide, container-type houses / prefabricated house / modular house / porta cabin not only break the limitations of on-site installation of normal prefab house, but also allow construction workers to experience a comfortable life like home. Prefabricated house realizes standardized design, factory production, assembly construction, and integrated decoration, which can greatly shorten the temporary construction time of the project and speed up the time for workers to enter the site.

porta cabin

In recent years, GS Housing has relied on professional production and manufacturing technology to improve the efficiency of on-site module installation while making the module units flexibly disassembled and built in different places, improving the reuse rate of buildings, and truly realizing the "mobile" construction concept.

At present, it has become a consensus in the construction industry to transform and upgrade to industrialization, eco-friendly, and intelligence with scientific and technological innovation as the guide and prefabricated buildings as the starting point. Faced with development opportunities in the construction industry, GS Housing Group will continue to actively promote prefabricated construction methods, increase the application of new intelligent construction technologies and products in project construction, comprehensively improve the overall level of project construction, and gather momentum to empower the transformation and upgrading of temporary buildings.

NEOM PROJECT

Post time: 19-12-24