CE Certification Prefab House Quotes – Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing

Short Description:


porta cbin (3)
porta cbin (1)
porta cbin (2)
porta cbin (3)
porta cbin (4)

Product Detail

Product Tags

Related Video

Feedback (2)

We've one of the most innovative manufacturing devices, experienced and qualified engineers and workers, recognized good quality handle systems and also a friendly experienced income team pre/after-sales support for Global Container Homes, Prefab Steel Buildings, Modular Home Cost, The principle of our company is to provide high-quality products, professional service, and honest communication. Welcome all friends to place trial order for creating a long-term business relationship.
CE Certification Prefab House Quotes – Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing Detail:

Two Floor Prefabricated Labor Mining Camp Container House Modular House Video

The mining camp consists of 1605 sets flat packed container houses, prefab houses, detachable houses, include 1095 sets 6055*2990*2896 mm ( 3 meter width ) standard multi functional flat packed container houses, 3 sets 3 meter (width) guard modular houses, 428 sets 2.4 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, and 3 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, 38 sets stair kind flat packed container houses and 41 sets walkway container houses.

The mining camp were shipped into two batch, the first batch (524 sets) flat packed container houses. After Indionesia cusomter received the first batch container houses and checked the houses quality, they continued to book the second batch from us: 1081 sets flat packed container house, and these modular houses had been deliveried to our customer on time.

Two Floor Prefabricated Labor Mining Camp Container House Modular House2

The two floor prefabricated labor mining camp container house modular house were on installation by local worker.

Mining camp accommodation (6)

Installation Video of GS Housing Prefabricated Camp

For the oversea projects, in order to help the contractor save the cost and install the houses ASAP, the installation instructors will go abroad to guide the installation on site, or guide via online-video. in addition, the multi-types installation guides will be sent you to solve various problems.

Standard flat packed container house structure

The flat packed container house consists of upper frame components, bottom frame components, column and several interchangeable wall plates,and there’re 24 sets 8.8 class M12 high-strength bolts connect the upper frame & columns, column&bottom frame to form an integral frame structure, ensures the stability of the structure.

Two Floor Prefabricated Labor Mining Camp Container House Modular House

The product can be used alone, or form a spacious space through different combinations of horizontal and vertical directions. The house structure adopts the cold-formed galvanized steel, the enclosure and thermal insulation materials are all non combustible materials, and the water, heating, electrical, decoration and supporting functions are all prefabricated in the factory. No secondary construction is required, and it can be checked in after on-site assembly.

Two Floor Prefabricated Labor Mining Camp Container House Modular House

GS Housing Prefab House Production Bases

GS Housing’s five production bases have a comprehensive annual production capacity of more than 170,000 houses,the strong comprehensive production and operation capabilities provide a solid backing for houses production.


Product detail pictures:

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures

CE Certification Prefab House Quotes –  Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing detail pictures


Related Product Guide:

With our outstanding administration, powerful technical capability and strict top quality handle procedure, we go on to provide our purchasers with reliable good quality, reasonable selling prices and excellent services. We goal at becoming certainly one of your most responsible partners and earning your gratification for CE Certification Prefab House Quotes – Two Floor Prefabricated Labor Mining Camp Container House Modular House – GS Housing , The product will supply to all over the world, such as: Argentina, Karachi, Swaziland, Customer satisfaction is our goal. We are looking forward to cooperating with you and providing our best services for you. We warmly welcome you to contact us and please feel free to contact us. Browse our online showroom to see what we can do for you. And then E-mail us your specifications or inquiries today.
  • The product classification is very detailed that can be very accurate to meet our demand, a professional wholesaler.
    5 Stars By Lindsay from Vietnam - 2018.06.30 17:29
    Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Alice from Somalia - 2017.09.26 12:12