Duo pavimento prefabricated labore Mining Camp Campyng Domus Modular Domus

Short description:

Duo pavimento prefabricated labore Mining Camp Campyng Domus Modular Domus


  • Notam:Gaudium Housing / OEM
  • CERTINITAS:CE, EAC ISO, SGS
  • Duc tempus:VII diebus ad mole ordo
  • Color:Libitum
  • Orgin:Tianjin, Jiangsu, Guangzhou, Sichuan de Sina
  • Porta CBIN (III)
    Porta CBIN (I)
    Porta CBIN (II)
    Porta CBIN (III)
    Porta CBIN (IV)

    Product Detail

    Product Tags

    Duo pavimento prefabricated labore Mining Camp Campyter Domus Modular Domus Video

    Et Mining CastraPatet ex MDCV sets plana facis continens domos, prefab domibus, Desacable domos includit MXCV Sets (VI) LV * MMCMXC * MMDCCCXCVI mm (III meter latitudine) vexillumMulti eget FlatpADFRICTUScontainerhouses, 3 sets 3 meter (width) guard modular houses, 428 sets 2.4 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water closet houses, and 3 meter (width) shower houses, male toilet houses, female toilet houses, male & female toilet houses, male bath rooms, female bath rooms, water Closet domibus, XXXVIII sets torto plana facis continens domos XLI Sets Walkway Container domibus.

    InMining castraUit in duas batch, primo batch (DXXIV occidere) plana facis continens domos. Post Indionesia cusomter accepit primum batchContinens domoset repressitdomosQualitas, ut continued ad libri secunda batch ex nobis: MLXXXI occidere plana facis continens domum ethaedomos modularisfueratDiligi nos mos in tempore.

    Duo pavimento prefabricated labore metalla castris continens domum modularis house2

    InDuo pavimento prefabricated labore metalla castris continens domum modularis domus erant in installation per loci opificem.

    Mining castris accommodationem (VI)

    Installation Video de GS Housing Prefabricated Castra

    Nam OVESEA projects, ut ad auxilium redemptore nisi sumptus et install domibus ASAP, in installation eruditores ibimus foris ad dirigendam institutionem in situ, seu ducem per online video. In addition, multi-types installation duces et misit te solvere variis problems.

    The flat packed container house consists of upper frame components, bottom frame components, column and several interchangeable wall plates,and there're 24 sets 8.8 class M12 high-strength bolts connect the upper frame & columns, column&bottom frame to form an integral frame structure, ensures the stability of the structure.

    Duo pavimento prefabricated labore Mining Camp Campyng Domus Modular Domus

    Quod productum potest esse sola, aut formare spatiosam spatium per diversas junctiones horizontalem et verticalem directiones. In domum structuram adoptat frigus-formatae galvanized ferro, clausura et scelerisque velit materiae sunt omnes non combustable materiae et aqua, calefacit, electrica, in fabrica et supporting munera omnes prefabbricatum in fabrica et supporting munera omnes prefabbricatum in fabrica et supporting munera omnes prefabbricatum in officinam. Nulla secunda constructione requiritur, et non potest sedatus in post in-site ecclesiam.

    Duo pavimento prefabricated labore Mining Camp Campyng Domus Modular Domus

    Gaudium Housing Prefab Domus Productio Bases

    Gaudium habitationi de quinque productio bases habere comprehensive annua productionem facultatem plus quam 170,000 domibus, fortis comprehensive productionem et operationem capabilities providere solidum tergum pro domibus productio.

    成都工厂

    Sichuan Prefab Domus productio Base

    工厂效果图

    Prefab Domus Productio Base Guangdong

    天津工厂

    Tianjin Prefab Domus productio Base

    常熟工厂

    Jiangsu Prefab Domus productio Base

    沈阳工厂

    Shenyang Prefab Domus productio Base


  • Previous:
  • Next: